Cable Handling & Laying Equipment

  • Name of Project: Structural upgrades to the Cable Path – Volumetric Extension of Carousel Capacity
  • Scope of Work: Study of the interferences (such as geometric collisions, visibility reduction), impact assessment (structural and stability checks) and engineering of the following solutions due to the extension of the volumetric capacity of the carousel of a Cable Laying Vessel:
    • Modular and removable extensions for the Carousel;
    • New Pickup Arm rated for offshore operations;
    • Verification of the slewing / luffing systems, rigging, foundations and mast e selection of the components to the replaced;
    • New rest cradles for both Pickup Arms;
    • Extensions of the towers for the control cabins Other minor steelworks needed by the on-board installation;
    • On board assistance during mobilization works.

    At a further stage, the strengthening of the aft deck has been specifically designed to hoist a 42t SWL winch for the purpose of the project.

BeReady (c): Digital DP Trials System

BeReady (c): Digital DP Trials System

Customised Offshore A-frame 8t @ 2.0m Hsig

Customised Offshore A-frame 8t @ 2.0m Hsig

Dynamic Analysis

Dynamic Analysis

Offshore A-frame SWL 45t @ 2.0m Hs

Offshore A-frame SWL 45t @ 2.0m Hs

Gondola for underwater survey equipment

Gondola for underwater survey equipment

Customised Retractable Landing Systems

Customised Retractable Landing Systems

Upgrade of DP2 Multipurpose Ships / “GLOMAR WORKER” & “GLOMAR SUPPORTER”

Upgrade of DP2 Multipurpose Ships / “GLOMAR WORKER” & “GLOMAR SUPPORTER”

Mooring Analysis & Buoy-field Design

Mooring Analysis & Buoy-field Design

Padeye Tester, 50-200t SWL

Padeye Tester, 50-200t SWL

Neptunus, il software facile e intuitivo per la gestione navale

Neptunus, il software facile e intuitivo per la gestione navale

Cable Handling & Laying Equipment

Cable Handling & Laying Equipment

Increase of Deadweight

Increase of Deadweight

Analysis & Design of structures for welcome bar on board Luxury Cruise Ship

Analysis & Design of structures for welcome bar on board Luxury Cruise Ship

Design of Offshore A-Frame

Design of Offshore A-Frame

Subsea Chain-Trencher: Structural Verification

Subsea Chain-Trencher: Structural Verification

Stability of a 1950’s Museum Ship as Commercial Cruise Unit

Stability of a 1950’s Museum Ship as Commercial Cruise Unit

Fuel Oil Sampling Plans as per IMO MEPC.1/Circ.864/Rev.1

Fuel Oil Sampling Plans as per IMO MEPC.1/Circ.864/Rev.1

Il tuo titolo va qui

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Il tuo titolo va qui

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.